Buffer space progress
All the gubbins in the apex/soffit of the buffer space is now in, the whole area is plastered and the screed is in. The tiler will be putting down a self levelling compound to bring the floor up to the correct level and then he can add the slate flooring. The slate will have areas cut out to take matting to wipe feet on and also two square apertures for grilles to cover th ventillation pipes that terminate in the floor (these will draw cold air from the East side of the house to supply the buffer space).
0 Comments:
Post a Comment
<< Home